Safety Report update for Gentilly-2 NPP

GENTILLY-2

SCOPE

Update the Gentilly-2 safety report for CNSC submission.

DESCRIPTION

With the shutdown of the Gentilly-2 power plant several modifications occured in the plant and these modifications have to be reflected in the safety report. Furthermore some accident analyses are no longer relevant while new scenarios must be considered.

The scope of work included the update of the first volume of the safety report (plant and systems descriptions), review of new safety analyses and implementation of these analyses results in the other volumes of the safety report.



DISCIPLINES

  • Safety Analysis
  • Licensing

CLIENT

Hydro-Québec

Gentilly-2, Canada


Timeframe

2014